I have quite different Ideas with the comments above... sorry I say something wrong..
I think we should wait a little bit more for several years in order to have this high speed train as to let our people have enough education to face the comming challenges.
I have quite different Ideas with the comments above... sorry I say something wrong..
I think we should wait a little bit more for several years in order to have this high speed train as to let our people have enough education to face the comming challenges.
I have quite different Ideas with the comments above... sorry I say something wrong..
I think we should wait a little bit more for several years in order to have this high speed train as to let our people have enough education to face the comming challenges.
ຖ້າດົນໄປ ເງິນຊິບໍ່ບິນໄປເຂົ້າຖົງຄົນອື່ນຫວາພໍ່ອາວ?
Stupid! Is High speed train neccessary? I don't think so if you have to give the land 5 Km offset from the center line train root. And don't you think about the electricity to feed dairy the train because nowadays the electricity always drop. Can you imagine that what's gonna be happen
Stupid! Is High speed train neccessary? I don't think so if you have to give the land 5 Km offset from the center line train root. And don't you think about the electricity to feed dairy the train because nowadays the electricity always drop. Can you imagine that what's gonna be happen
I have quite different Ideas with the comments above... sorry I say something wrong..
I think we should wait a little bit more for several years in order to have this high speed train as to let our people have enough education to face the comming challenges.
ຖ້າດົນໄປ ເງິນຊິບໍ່ບິນໄປເຂົ້າຖົງຄົນອື່ນຫວາພໍ່ອາວ?
Stupid! Is High speed train neccessary? I don't think so if you have to give the land 5 Km offset from the center line train root. And don't you think about the electricity to feed dairy the train because nowadays the electricity always drop. Can you imagine that what's gonna be happen
Don't worry about electric drop because they will have backup power
generators in case something happen. We should worry about our land
that Laos Govt. give to China 5km wire x 450km long along the hi-speed
train tracks will owned by China = ( 5km x 2 ) x 450km = ????km2???.
( 5km x 2km ) x 450km of land that Lao people have to move out and
couldn't even do anything inside of it and that land bill be authorized by
China.
In this case Laos govt. have to deal with relocating of its population if
the train track hit the villages or towns. The future most profits of this Hi-
speed train will go to China, Laos is losing and losing.